If you have looked into solar in the last two years, someone has told you that NEM 3.0 ruined it. That is not quite what happened.
What changed is that exported power stopped being worth what imported power costs. Under the old rules, a kilowatt-hour you sent to the grid offset a kilowatt-hour you took from it, close to one for one. Under the current rules, exported power is credited at what that power is worth to the grid in the hour you sent it, and grid value at noon in San Diego is low, because thousands of other roofs are also producing.
That is genuinely worse for a solar-only system. It is also much more interesting than “solar does not work,” because the same rule that crushed the value of noon exports made evening exports worth several times the retail rate.
From net metering to net billing
The California Public Utilities Commission adopted the change in Decision D.22-12-056. In the CPUC’s own words, since April 15, 2023, customers applying for interconnection take service on the Net Billing Tariff. SDG&E calls its version the Solar Billing Plan.
Three things you should know about where you stand:
- If your system was interconnected under NEM 2.0, you keep those rules for 20 years from your interconnection date. You may switch to the current tariff, but you cannot switch back. Almost nobody should switch voluntarily.
- If you are installing now, you are on the Solar Billing Plan. There is no opting out.
- Applications filed in 2026 that qualify get their export rate schedule locked in for nine years from the Permission to Operate date. That is rate certainty, which has real value in a market where the utility revises its tariffs several times a year.
What SDG&E pays for exported power
Export credits are set from the CPUC’s Avoided Cost Calculator and published as an hourly schedule. SDG&E splits each credit into a generation component and a delivery component; the full credit is the two added together.
Here is the actual 2026 schedule for a system interconnecting in 2026, weekdays, in cents per kWh.
| Hour | August | July | January |
|---|---|---|---|
| 10 a.m. to 2 p.m. | ~6.1¢ | ~5.3¢ | ~6.2¢ |
| 4 p.m. | 7.7¢ | 15.4¢ | ~9.3¢ |
| 5 p.m. | 92.5¢ | 27.9¢ | ~9.3¢ |
| 6 p.m. | 107.0¢ | 32.4¢ | ~9.3¢ |
| 7 p.m. | 90.8¢ | 33.2¢ | ~9.3¢ |
| 8 p.m. | 98.5¢ | 20.5¢ | ~9.3¢ |
| 9 p.m. | 87.7¢ | 8.5¢ | ~9.3¢ |
| 10 p.m. | 86.6¢ | n/a | n/a |
| 11 p.m. | 9.0¢ | n/a | n/a |
Generation and delivery components summed, NBT26 vintage filtered to calendar year 2026. January is flat at about 9.3 cents across the whole 4 p.m. to 9 p.m. window. Re-derived October 14, 2026.
Across the whole of 2026 the average is about 9.1 cents per kWh, and the single highest hour block is that August 6 p.m. slot at 107.0 cents.
Read those numbers carefully, because the shape matters more than any single figure. The very high values are concentrated in a small number of summer evening hours. August is the strongest month by a wide margin, July is much lower, and winter is flat and low all day. Anyone who tells you that you will be paid a dollar a kilowatt-hour is quoting the best hour of the best month of the year. Anyone who tells you exports are worth six cents is quoting midday and ignoring the rest.
The round trip, in one number
Solar Billing Plan customers at SDG&E are required to take service on the EV-TOU-5 rate. Effective August 1, 2026, that plan charges 80.2 cents per kWh for summer on-peak power between 4 p.m. and 9 p.m., 49.6 cents off-peak, and 13.1 cents super off-peak.
Now put the two sides together. A kilowatt-hour your panels make at noon in August and send to the grid earns you about 6 cents. A kilowatt-hour you buy back at 6 p.m. that same day costs you 80.2 cents.
That is a gap of roughly 74 cents on the same kilowatt-hour. It is the whole reason the industry conversation in San Diego shifted from “how many panels” to “panels plus storage.”
And why a battery changes the sign
Look at the August column above against that 80.2 cent import rate. From 5 p.m. to 10 p.m. in August, export credits run between 87 cents and 107 cents per kWh. Every one of those hours pays more than the 80.2 cents you would save by simply using the power yourself. From 9 p.m. onward the import rate drops to 49.6 cents off-peak while the export credit is still around 87 cents, which widens the gap further.
In those specific hours, on those specific days, sending stored power to the grid is worth more than consuming it. That is a genuinely unusual situation and it is a direct consequence of the same rule change that hurt midday exports.
Five details that change the math
1. SDG&E customers do not get the export adder
Residential customers of PG&E and SCE who interconnect before the end of 2027 receive an additional credit on exported energy for nine years. SDG&E customers are excluded. The CPUC’s stated reason is that SDG&E’s electric rates are higher, so SDG&E solar customers already generate more bill savings.
That is worth understanding rather than resenting. It means San Diego solar value comes from avoiding an expensive import, not from being paid well for an export. Which points at storage and at self-consumption, again.
2. The base services charge does not go away
SDG&E’s base services charge is non-nettable. Export credits cannot offset it. Every solar household still pays it every month.
3. You are moved onto EV-TOU-5 whether or not you own an EV
The Solar Billing Plan requires it. It is a deliberately shaped rate: very cheap overnight power at 13.1 cents, very expensive evening power at 80.2 cents, effective August 1, 2026. If you charge a car or run a battery, that shape is an advantage. If you do neither, it is a rate designed for someone else.
4. Credits roll over monthly, and surplus pays at wholesale
Excess export credits carry forward month to month. At the annual true-up, any remaining surplus generation is paid out at a wholesale price, which is far below both the retail rate and the hourly export credits above. Deliberately oversizing a system to bank credits does not work the way it used to.
5. If you are with a community choice provider, half of this is set by them
Much of San Diego County is served by a community choice aggregator such as San Diego Community Power or Clean Energy Alliance. If you are, your provider sets the generation portion of both your import charges and your export credits, not SDG&E. The delivery half still comes from SDG&E.
The figures above add SDG&E’s generation and delivery components together, so they describe a bundled SDG&E customer. If you are on a community choice plan, ask your provider for their export schedule. This is one of the most commonly skipped questions in San Diego and it can move your numbers meaningfully.
Four questions worth asking any installer
- What does my production look like against the export schedule, hour by hour? Not annual offset. Hours.
- What does the system do between 4 p.m. and 9 p.m.? That window is where your money is, on both sides of the meter.
- With a battery, how many of the high-value summer evening hours can it actually serve, and for how many days? A battery that empties in ninety minutes captures a fraction of those hours.
- Am I a bundled SDG&E customer or on a community choice plan, and which export schedule applies to me? If they do not know, they have not done the math.
The import side of this page, what SDG&E charges by time of day, is where the other half of the arithmetic lives.