San Diego County · San Diego Gas & Electric

Solar panels in San Diego, CA

San Diego homeowners pay some of the highest residential electricity rates of any utility in California, and SDG&E has raised them repeatedly. That is the whole reason solar math works better here than almost anywhere else in the country: the more you pay per kilowatt-hour, the faster a system pays for itself.

Utility
San Diego Gas & Electric
Export rules
NEM 3.0 applies county-wide, with no municipal exception
Callback
One licensed installer, within one business day

Reviewed and updated October 14, 2026

But San Diego also sits under the strictest export rules in the state. SDG&E is regulated by the California Public Utilities Commission, which means NEM 3.0 applies to every new residential solar system in the county. What you get paid for the power you send back to the grid is a fraction of what it was under the old rules. That single fact changes what you should buy.

This page explains what that means for your bill, what size system your home actually needs, and how to get real numbers without sitting through four sales appointments.

Start here

Size a system for your San Diego home

Start with your bill, not a panel count. A 1,800 square foot home in Clairemont with no air conditioning and no EV needs a very different system than the same house in Poway with a pool pump and two cars charging overnight. The estimate uses California’s statewide average rate, which runs well below SDG&E’s, so read it as the conservative end.

$180
$50$600+

Avg. rate $0.32/kWh · 5.8 peak sun hrs/day

Recommended system

9solar panels
3.6 kW system

Annual energy

6,097

kWh / year

Value of power

$1,949

per year at state average rate

Roof area

158

sq ft needed

CO₂ offset

4.1

metric tons / year

A 3.6 kW system in California could produce power worth about $1,949 a year at the state average rate, before the cost of the system. Your utility may credit exported power at a lower rate.

Request a callback

Based on California's 2024 average residential rate of 31.97 cents per kWh (EIA). Your own rate is on your bill. Production is a planning estimate, not a measured figure for your roof.

Sizing uses peak sun hours and a 400 W panel rating, set to offset about 90% of your usage. Real system sizing requires an on-site assessment of your roof, shading and panel orientation.

What is different about San Diego

NEM 3.0 applies here, with no exceptions

This is the thing to understand before you talk to anybody. Because SDG&E is an investor-owned utility, San Diego County homeowners are on NEM 3.0. Exporting surplus power to the grid earns far less than it used to, so a system designed to overproduce during the day and sell the extra back is no longer the efficient design.

What works instead is using more of your own power at home. That usually means a battery: store the midday surplus, spend it during the expensive late-afternoon and evening hours, and buy much less from SDG&E at peak rates. In counties with municipal utilities the calculation is different, because those utilities write their own export rules. San Diego has no municipal electric utility, so there is no version of this where NEM 3.0 does not apply to you.

A battery is not automatically correct. It depends on your usage shape. But in San Diego it should be priced, not dismissed. What storage actually does to a California bill is here, including what to ask before you buy one.

The coast and the inland valleys are two different solar markets

San Diego County runs from the beach to the desert in about forty miles, and production follows. Coastal neighborhoods lose meaningful output to the May and June marine layer, the overcast stretch locals call June Gloom. Inland communities a few miles east see far more direct sun across the same months.

Practically: a quote built on a county-wide average will overstate production in Ocean Beach and understate it in Ramona. Ask any installer which irradiance figure they used for your specific address, and whether they modeled your actual roof planes or a generic south-facing assumption.

The expensive hours are the late afternoon, not the sunny ones

Solar produces most at midday. SDG&E’s on-peak window is 4 p.m. to 9 p.m., every day of the week, on all of its residential time-of-use plans. That mismatch is the entire argument for storage under NEM 3.0, and it is worth seeing concretely before you decide.

Without a battery, your panels generate a surplus at 1pm that earns you a low export credit, and then at 6pm you buy power back at the day’s highest rate. With a battery, that same surplus is stored and spent during the peak window, so you avoid the expensive purchase entirely. The value is in the gap between those two prices, not in the size of the array.

This is also why a bigger system is not always the better buy here. Past a certain point you are adding panels whose output you can only export at the lower rate. Ask an installer to show you the production curve against your own usage curve, hour by hour, rather than an annual total.

Two permitting paths, depending on your address

Homes inside City of San Diego limits permit through the city. Homes in unincorporated areas go through the County of San Diego, and the incorporated cities around the county run their own processes. Timelines differ. This is a question to ask up front, because a long permit queue is the most common reason a project that was promised in six weeks takes four months.

Your utility decides your math

San Diego Gas & Electric is the distribution utility for the whole county, and that is the half that sets your export terms: the interconnection, the meter and the net billing tariff all run through SDG&E regardless of who sells you the electricity. There is no municipal electric utility here to opt you out of it.

If the top of your bill says San Diego Community Power or Clean Energy Alliance rather than SDG&E, you are still on everything above. A community choice aggregator supplies the generation and changes that line of your bill; it does not change the export rules, the interconnection queue, or the time-of-use window your battery would be working against. What it can change is the credit itself. A CCA sets the generation half of what you earn on exports and can pay a small adder on top of what SDG&E alone would credit, so exports under a CCA are worth the same or slightly more, never less. Check your own aggregator’s published solar billing terms for the current figure. Everything else on this page applies to you unchanged. Read SDG&E’s own published pricing plans and hold any quote you are given against them.

San Diego County coverage

Where we can get you a callback

We work with licensed installers across the county, and the county is not one market.

Chula Vista and National City sit in the South Bay, where older housing stock means a roof assessment matters more than panel selection. Oceanside, Carlsbad and Encinitas are coastal North County, where the marine layer belongs in the production model. Escondido, San Marcos and Vista are inland North County, with higher irradiance and higher summer cooling loads. La Mesa, Santee and Poway are inland East County, the strongest production in the region and the places where pool pumps and EV charging most often justify a larger array.

El Cajon has its own page, with East County rates and permitting covered in detail.

Get started

Have a specialist call you back.

One licensed installer serving San Diego County. A real person calls you to go through your roof, your bill and what you actually qualify for. No appointment carousel, no five companies competing for your evening.

Responses within one business day

Add more details (optional)

One installer. Never a panel of companies.

We pass your details to one installer. We do not sell your information to data brokers or advertisers. See our Privacy Policy and Terms of Use.

San Diego questions

Solar in San Diego, answered.

Yes. SDG&E is an investor-owned utility regulated by the California Public Utilities Commission, so every new residential solar system in San Diego County falls under NEM 3.0. Export credits are substantially lower than under the previous rules, which is why battery storage matters more here than in cities served by their own municipal utility.

Ready to see real numbers for San Diego?

The estimate above is a starting point. A site assessment is what turns it into a price.

Or call us and we’ll connect you with the installer: (949) 436-9613