You still have full one-for-one net metering
California’s NEM 3.0 rules, which sharply reduced what homeowners earn for sending surplus solar back to the grid, came from the California Public Utilities Commission. The CPUC regulates investor-owned utilities such as SCE, SDG&E and PG&E. It does not regulate city-owned utilities.
Colton Electric is a city department, so it writes its own net metering terms, and what it currently writes is the thing the rest of California lost. In the city’s own words, its net metering policy gives the customer a one for one, kilowatt-hour credit against consumption. Surplus production is banked on your account and drawn back down when you need it, at the same value as a kilowatt-hour you would have bought.
Two details belong in any honest version of that. Colton trues the account up at the end of each June, and whatever is still banked at that point is paid out at an avoided cost of $0.04 per kilowatt-hour, which is a fraction of retail. And the city caps a residential system at 100% of your trailing twelve months of consumption, with no exceptions. Both push the same way: size the system to your own usage, not to export, because exporting beyond what you consume is worth little and will not be approved anyway.
Ask your installer which utility’s export rules they applied. If they describe an export rate, a four-hour peak window, or a battery that pays for itself by arbitraging exports, the quote is not about your house.
A tiered rate means solar eats your most expensive power first
This is the part a solar salesperson is unlikely to get right, in either direction. Colton Electric does not bill a flat rate and it does not bill residential customers on time-of-use. It bills in tiers, and for the fiscal year running July 1, 2026 through June 30, 2027 the residential energy charge is $0.21278 per kilowatt-hour on the first 500 a month, $0.29269 from 501 to 1,500, and $0.37000 on everything above 1,500. On top of that sit a $15.00 monthly basic service charge, a public benefit charge of $0.00712 on every kilowatt-hour, a power cost adjustment and taxes, so treat the tier figures as the floor of what your power costs rather than the whole of it.
Here is why the structure matters more than the number. Every kilowatt-hour your panels produce is one you do not buy, and the ones you stop buying come off the top of the stack. A household that regularly runs past 1,500 kilowatt-hours a month, which in Colton usually means air conditioning plus a pool pump or an EV, is buying its marginal power in the top tier and gets a one-for-one credit against it. A household that never leaves the first tier is displacing much cheaper power, and payback stretches out a long way.
So the honest answer in Colton is sharper than the one we would give in Edison territory: look up your own monthly kilowatt-hours, find the tier they land in, and judge every estimate against that. If a quote shows you the payback period people see in SCE territory, it used the wrong rate structure, not just the wrong number.
One figure we are deliberately not putting next to those tiers is Edison’s average rate. Edison’s is an average across a whole territory; Colton’s tiers are marginal prices before adders. Comparing the two would be arithmetic on two different things, and the tier argument above does not need it.
What Colton requires before anyone puts panels on your roof
Colton runs its own solar application process and it has firm limits that an out-of-town installer may not know. Residential applications go through the city’s PowerClerk portal and are for systems of 10 kilowatts or smaller. The system is capped at 100% of your actual consumption over the past twelve months, and the city states there are no exceptions. If you do not have a full twelve months of history, the cap becomes 2 watts per square foot, so a 1,500 square foot home would be held to 3 kilowatts unless you file a California Energy Commission building simulation such as CBECC or EnergyPro instead.
The city has collected a $225 solar review charge since March 2021, payable before your installation permit is issued, and Colton Electric requires a production meter and two AC disconnects on every solar installation. None of that is unreasonable and all of it is money. It belongs in the quote you compare rather than arriving afterwards. Colton offers no solar rebates of its own, and the city says in writing that it will not recommend a solar vendor.
A battery here buys you outages, not savings
Across most of California the case for a home battery rests on export credits being worth far less than retail power, so storing your production beats selling it. That case does not exist in Colton. With one-for-one net metering, the grid is already doing the job a battery would do, and the City of Colton says exactly that: you do not need battery storage to operate your solar system, and the one time it helps is during a power outage.
That last part is worth understanding before you decide. A grid-tied solar system shuts down when the grid goes down, by design, so panels alone give you nothing in an outage. If backup power is something you want, a battery is how you get it, and it is a resilience purchase rather than a savings one. We would rather you bought it for the right reason than be sold it for the wrong one.
The heat is on your side
Colton sits inland in the San Bernardino Valley and gets strong, consistent sun with hot summers. Air conditioning carries the bill from roughly June into September. That seasonal shape is the strongest thing in favour of a system here: high summer usage, high summer production, and the two line up.
Practically, size against your summer peak rather than your annual average. A system sized off a February bill will disappoint you in August.
Older housing stock means checking the panel first
Much of Colton’s housing predates modern household electrical loads, and 100-amp main service panels are common in older neighbourhoods. Adding solar, and particularly solar with a battery or an EV charger, can require upgrading to 200 amps.
That is normal work, not a dealbreaker, but it is real money and it belongs in the quote you compare rather than appearing after you have signed. Ask directly whether the price includes any required service upgrade and whether anyone has physically looked at your panel.
Your permit and your interconnection are the same city
In SCE territory, a finished solar installation still has to clear two organisations: the city inspects it, and then Edison grants permission to operate before you can legally turn it on. That second step is a separate queue at a separate company, and it is the stage where projects most often stall after the installer has been paid.
In Colton, the building department and the electric utility are both the City of Colton, and the residential application runs through one portal, PowerClerk. One organisation, one handoff fewer. That is not a promise of speed and you should still ask what turnaround currently looks like, but it removes a coordination gap that costs SCE customers weeks.
Ask any installer how many Colton projects they have actually completed. Most Inland Empire installers work almost entirely in SCE territory, and Colton is a small share of a big region. Experience with Edison’s interconnection process does not transfer to a municipal utility.
Five questions that separate a real quote from a template
Because so much of what makes Colton different is invisible on a standard quote sheet, these are worth asking directly. Which tier does my marginal kilowatt-hour sit in, and can you show me where that came from on my bill? Which net metering terms did you apply, and do you know Colton is still one for one? Does this price include the $225 city review charge, the production meter and the two AC disconnects? Does it include an electrical service upgrade if my panel needs one? And who files the PowerClerk application, given the 100% sizing cap?
If an installer cannot answer the first two without checking, they built your quote on Edison’s numbers. For what that comparison looks like from the other side of the city line, our San Bernardino page covers the same questions for an SCE household, on a time-of-use rate, under export rules you do not have.